INSU-LOG Materials Package
1. Pressure treated sill plate and sill sealer for perimeter foundation
2. 2x8, 2x10,2x12 Conventional first floor framing with solid bridging as per design
3. 3/4" x 4'x8' T&G ThruFloor locking panels with construction adhesive
4. Log skirting and trim boards
5. *Pre-Panelized First Floor exterior walls are 2”x6” studs @16”o/c with single bottom plate and double top plate, with 2”x8” double &OSB nail laminated headers for windows and doors. 1/2" Exterior sheathing on walls with typar housewrap, 2”x8” x random lenght Log Look Siding with Full False Corners. R-20 Insulation for cavity of interior of wall with 6 mil vapor barrier and 1” x 8” random length t&G Pine liner * The first floor wall system with window and door openings are pre panelized for quick installation.
6. Window extension jambs
7.Wood Clad Insulated Low E double-hung, awning, angle bay, casement, cottage and special fixed glass windows per plan with snap-in "colonial" wood grilles and screens (where applicable)
8. Solid wood or Steel insulated exterior doors (24 styles to choose from) with Schlage Lockset
9. 2x4 and 2x6 Interior partition framing, with shoes and plates, 2x8 interior header materials
10. Second floor system with 3/4" x 4'x8' T&G ThruFloor locking panels for 1-1/2" and 2 story models (not visible) Open loft areas 6x8 beams, 2x6 select grade Spruce VJ T&G with stairs and rail system
11. Gable end truss or framing per plan
12. 1/2" insulated sheathing, matching log siding for gable ends, dormers, second story walls
13. Prefabricated wood roof trusses or conventionally framed 2 x 12 rafter roof system per design
14. 1/2" roof sheathing with H Clips, 2x12 collar ties or LVL ridge beam as per plan
15. 15 LB Asphalt impregnated felt and Ice & Water shield
16. 35 year warranty self sealing roof shingles
17. Barge rafter and gable end overhang (12" standard)
18. Fascia, soffit and vent system (color choices)
19. 12"-16" standard eave overhang
20. Gable end louvers and/or roof vent system as required
21. Porch posts with complete rail system, Newels, Handrails, Balsters
22. Porch carry beams and roofing per plan,porch rafters on 16"O/C, Ve Joint Tongue and Grove for Porch Ceilings
23. Pressure treated frame & joint hangers with 5/4 x 6 cedar ease edge decking
Additional Features
* Drip Edge and Gutter Apron (not visible)
* Urethane foam for windows, and doors (not visible)
* All required nails and fasteners
* Illustrated Construction Manual
* 5 sets of Final Blueprints
* Step flashing for dormers (not visible)
For more information clickhere